历史
2020
- Optimized the production line to 500K pcs/month production capacity
2019
- Over 1000 power supply solustions for OEM and ODM including Fuel cell vehicles, aircraft and marine
2018
- Finished the power converter of 600V-900V high voltage as input power
2017
- Finished the power converter 100kw power converter for EV project of The Chinese University of Hong Kong
2016
- Founded the US-, AU- and EU- based warehouses
2015
- All produgcs tested by digital and Intelligent devices
2014
- Created Intelligent high-temperature burn-in and testing room
2012
- CE, FCC, UL certificated
2011
- ISO 9001 certificated
2010
- Shenzhen facility founded
2007-2009
- High-effiency DC-DC converters up to 97% were developed
- High&low temperature test chamber, Automatic encapsulating machine and Digital testing devices installed
- 1W-10KW DC/DC Converters were developed including Step-up, Step-down, and Isolated types
2006
- Facility was established in Guangzhou
1990s
- Providing AC and DC power solutions for South China University of Technology and Guangzhou 7th R&D Institution